[ad_1]
The traffic on the Elbasan-Peqin axis was carried out for one hour with one lane due to the blockage of the road by inerts.
Emergency crews have made it possible to clear the road together with the help of traffic management police.
There were problems with the falling of stones in the Elbasan-Librazhd axis, the turns of Murrash, but without problems in circulation.
The subcontracting company along this axis has made possible the cleaning. Currently the intensity of precipitation has decreased.
top channel
[ad_2]
Source link